The runway closure in the NOTAM above is scheduled for ___.

Prepare for the Initial Tower Cab Test with targeted quizzes and informative explanations. Gain the knowledge needed to excel in your air traffic control career. Ace your exam!

Multiple Choice

The runway closure in the NOTAM above is scheduled for ___.

Explanation:
Interpreting a NOTAM runway closure means reading the date window as the exact period the closure applies. If the NOTAM specifies a start date and an end date, the runway is closed for that entire span (usually inclusive of both ends) unless another NOTAM changes it. In this item, the closure window is from June 1 to June 10, which is a direct match to the option that states June 1 through June 10. The other date ranges—such as January dates or a window that starts after June 10—do not align with the NOTAM’s stated period. So the June 1–June 10 window is the correct interpretation.

Interpreting a NOTAM runway closure means reading the date window as the exact period the closure applies. If the NOTAM specifies a start date and an end date, the runway is closed for that entire span (usually inclusive of both ends) unless another NOTAM changes it.

In this item, the closure window is from June 1 to June 10, which is a direct match to the option that states June 1 through June 10. The other date ranges—such as January dates or a window that starts after June 10—do not align with the NOTAM’s stated period. So the June 1–June 10 window is the correct interpretation.

Subscribe

Get the latest from Passetra

You can unsubscribe at any time. Read our privacy policy